Fontainbleau

Fontainebleau Meeting Rooms

Las Vegas, NV
4000 ton structural steel project with moment frames and braced frames.

Fontainebleau Casino / Resort

Las Vegas, NV
40,000 ton structural steel project. We worked directly with the engineer and fabricator to maintain an accurate 3D model to aid in the ordering of steel for the entire project. This gave the owner and fabricator the ability to order and track steel much earlier in the project and identify construction issues.